ВНИМАНИЕ! На форуме началось голосование в конкурсе - астрофотография месяца СЕНТЯБРЬ!
0 Пользователей и 2 Гостей просматривают эту тему.
Немецкие специалисты работали по обе стороны баррикад
Первый пуск перенесли на 2019 или как?
Это вы про тех, кто сидел на острове Городомля?
Это не финансирование (не инвестиции), это выручка.
О Рапторе что-то слышно?
Цитата: Golossvyshe от 27 Апр 2018 [10:45:04]Это вы про тех, кто сидел на острове Городомля? http://space.boss.moscow/Note1/Note5.html
Since 2014, NASA has had ongoing concerns about SpaceX software traceability issues related to theAgency’s and company’s use of different software development processes. To develop software, NASAtraditionally sets all requirements, develops discrete parts, creates documentation for clear traceability,and tests the entire system at the end of its development. SpaceX on the other hand uses an iterativeapproach that focuses on testing throughout all phases of development and emphasizes creatingworking software versions with progressive updates instead of setting requirements and completingcomprehensive documentation. The lack of full documentation under the SpaceX approach increasesNASA’s difficulty for ensuring SpaceX software changes meet ISS safety certification requirements. InFebruary 2017, an operator error induced by using an uncertified software tool caused SpaceX’s10th CRS-1 mission to abort its planned rendezvous with the ISS before successfully berthing a day later.A subsequent audit conducted by the ISS Program in October 2017 before SpaceX’s 13th missionshowed the company had made significant progress in improving their software development processesand mitigating NASA’s concerns.
Additionally, NASA’s concerns about SpaceX systems engineering processes increased after theJune 2015 SpX-7 and September 2016 AMOS-6 failures.71 Because SpaceX continuously makes changesto its launch vehicle and spacecraft, the company has had more difficulty following industry standardsystems engineering principles.72 SpaceX has responded to these concerns by providing NASA moreinsight into its quality control and systems engineering processes.Moreover, SpaceX’s use of previously flown Falcon 9 first stage boosters for a CRS mission is a deviationfrom the original contract terms that we believe could introduce new risks to CRS missions. The Agencyapproved the use of a previously flown booster for the first time on the December 2017 SpX-13mission.73 While both CRS-1 and CRS-2 contracts require a new Falcon 9 for all missions, both contractsprovide NASA with the option to use a previously flown booster for a specific mission if the Agencydetermines the launch presents an acceptable level of risk for cargo resupply missions.
Жалуются на рост стоимости доставки грузов на МКС на 50% при выполнении контракта CRS-2.
Со 133 млн до 152 за полёт - это не на 50%, а даже меньше чем инфляция за прошедшие годы
Using current flight projections for CRS-2, SpaceX’s average price per kilogram increased by 50 percentcompared to its final CRS-1 mission price. In comparison, Orbital ATK’s average per-kilogram pricingdecreased by roughly 15 percent from its last CRS-1 mission.
SpaceX увеличил стоимость доставки 1 кг на 50%, а Orbital наоборот снизил на 15%
Dragon 2 имеет на 30% увеличенный герметичный объем,
Странно, что ещё не обсуждали свеженький документ: https://oig.nasa.gov/docs/IG-18-016.pdfРезультаты аудита весьма интересны.Жалуются на рост стоимости доставки грузов на МКС на 50% при выполнении контракта CRS-2. Иксы при этом приводят аргументы, дескать, издержки несут большие,
Мужик, да ты офигел! В каком бреду ты увидел такие цены?!- Понимаешь, какое дело... деньги очень нужны!
Действительно ли FH в состоянии выводить на НОО заявленные 64 т? Как насчёт прочности 2-й ступени?